According to The Hindu and The Times of India, OTEC power generation trials have started, presumably on the Sagar Shakti research vessel, which is a 1 MW closed cycle plant.
According to The Hindu and The Times of India, OTEC power generation trials have started, presumably on the Sagar Shakti research vessel, which is a 1 MW closed cycle plant.
Copyright © 2024 | WordPress Theme by MH Themes