key numbers:
Technology | Status | Size | Estimated date of operation |
---|---|---|---|
Cold Water Pipe | Planned | – | – |
OTEC onshore | Planned | 100 kW net | – |
OTEC onshore | Proposed | 1-10 mW | – |
SWAC | Planned | ? | – |
key numbers:
Technology | Status | Size | Estimated date of operation |
---|---|---|---|
Cold Water Pipe | Planned | – | – |
OTEC onshore | Planned | 100 kW net | – |
OTEC onshore | Proposed | 1-10 mW | – |
SWAC | Planned | ? | – |
Copyright © 2024 | WordPress Theme by MH Themes